Product Description
Swan swivel leisure chair hot sale,Arne Jocabsen Swan Chair - Bright red
Discription
1. Polish chrome |
2. Sumptuously padded seat to the soft fabric |
3. Seat for kinds of color |
4.Variable height gas lift with 360 swiel |
5.Stronge base enough-five star legs |
Container loadding
CBM: | 0.31 |
G.W. | 20 |
PC/CTN | 1 |
40HQ: | 202 |
20GP: | 85 |
DIMENSIONS | DESCRIPTION |
Item number | HE-170 |
Seat height | 40 |
Overall height | 95 |
Extemal seat width | 76 |
Backrest Height | 36 |
Seat Depth | 70 |
Overall stool depth | 70 |
Width of footrest | |
Base diameter | 60 |
Metal | CHROME/BRUSHED /STAINLESS STEEL |
Material | PU/FABRIC/LEATHER |
Package size | 77*77*52CM /1PCS |
Bar chair seat tops: |
1.back height: 36cm , seat width: 76cm , seat depth: 70cm |
2.materials: Generally, foam fillings, PU covers. We can offer this bar chair in UKFR or USFR foam, PU,leather and fabrics. |
3, PU/leather color: Generally black, white, cream, brown,red… |
Other specifications: Different colors are available for this bar chair. |
Fabric swivel leisure chair Base and footrest/ stem: |
1.Generally chrome/ brushed iron.Others: black nickel plating bases and footrests/ stems are available. Stainless steel is acceptable for this bar stool. |
2. Thickness of the bar chair base: 1.4mm;Diameter of the stem/ footrest tube: 58mm |
Package Discription: |
1. Generally 1PC/CTN. |
2. 5-layer hard carton and plastic boards is acceptable for this bar chair. |
3.packing materials: |
Plastic bag for the bar stool seat; |
Bubble bag and hard paper to wrap the bar stool base; |
Non-woven fabrics to wrap the footrest; |
We can pack this bar chair as your requirements |
4, shipping marks of this bar chair: Subject to your specification. (including your company name, item names, barcodes etc) |
Terms of Price: |
T/T, 30% deposit before production, 70% balance before loadding container. |
1.Generally, FOB SHEN ZHEN. Others: EXW is acceptable. |
2.The quotation of this bar chair bases on using the standard materials and package such as standard foam, pu and chrome iron. |
Delivery date: For a 40HQ 25-30 days after we get the receipt of deposit payment, not including the time of new samples/ items confirmation. |
Company Information