Product Details

Non-carbonated Aseptic Electric Filling Machine for PET Bottle / Glass Bottle 220V / 380V 2.2KW

Brand Name Hyford
Place of Origin China
Model Number CGF

Product Features

Delivery Time:30 working days
Certification:CE,ISO,SGS,BV

 
 
Non-carbonated Aseptic Electric Filling Machine for PET Bottle / Glass Bottle 220V / 380V 2.2KW
 
 
Quick Detail:
 
 
washing heads:9pcs
filling heads :9pcs
capping heads:4pcs
capacity:1000 bottles per hour(3-7L PET bottle, screw type cap)
filling temperature:normal temperature
compressed air: 0.5~0.6Mpa
main motor:2.2KW       
spraying pump:0.55KW    
liquid feedback pump: 0.55KW
water consumption:1.5t/h
overall size:2400×1850×2400mm
weight:3600Kg
 
 
Description:
 
  The CGF Series washing-filling-capping 3-in-1 machine for big bottle is our new developed production, getting production experience from our many years, basing on introduce, digest and suck the similar machine from foreign countries. The three functions of bottle rinse, fill and seal are composed in one body of the machine and drive by one electric motor.
The washing-filling-capping 3-in-1 machine for big bottle has the features such as high automation, compact structure, good perfection, easy to operation, safety and reliability, production can be adjusting .it is an ideal beverage equipment in current. It is used in large scope including PET bottles with round shape or others shape or glass bottles. Sealing can been chose between screwing cap (plastic bottle) and press cap( glass bottle). According to different material of bottle, shape of bottle and volume of bottle supplying from customers, we can change the design for meeting with customer’s requirement.
 
1. Adopt star wheel technology for inputting bottle. The star wheel uses creative designed bottle mouth holding mechanism which have the function of dividing bottle ,doing so it doesn’t need the transportation chains and bottle inletting screw rod, replacing bottle only need to change and adjust an little parts.
2. All the part of bottle transportation adopt bottle clamping technology and replace traditional star wheel by holding body of bottle .when change the shape of bottle, it doesn’t need to adjust the height of equipment, only for change and adjust a little parts.
3. Special designed bottle clamp for washer are bearing and duration, not contact with the screw part of bottle, avoiding the second pollution.
4. Holding month type washing clamp, bottle turns over 180 degree as track-way by itself, external washing and internal washing, high washing efficiency.
5. The star wheel for outputting bottle and bottle bottom support plate adopt screw way to do the motion up and down. while changing the shape of bottle, it only change the star wheel and curved board which are related to diameter of bottle without change the height of the transportation wheel and only need ten minutes to finish shifting shape of bottle.
 
 
Specifications:
 
Washing Heads: 3-18
Filling Heads: 3-18
Capping Heads: 1-6
Suitable Bottle Size: 3-7L PET Bottle
Capacity: 300-2000B/h
 
 
Competitive Advantage:
 

More compact structure, better appearance.The structure of bottle rinsing clamp is more sensitive. The screw capping head uses magnetic contact parts.

 
Hyford keeps 100% confident and try our best ability to satisfy customers\' requirements with their selected products. Additionally, Hyford owns a professional aftersale customer service team. Therefore, If you have any inquiries or questions, please visit our store, have a look other products and leave your message. Your message will be highly appreciated! Welcome to Hyford!
 
 
Sales and Technical Service
 
I. Installation and Adjustment
 
When the equipments are delivered to the locality, the user should unpack them and make them in position according to the layout. Our company will send out a experienced technical personnel to instruct the installment, the debugging of the equipment and the trial production, and In the plan time achieved designed capacity, the installment, the debugging time are 5-10 days, during this time our company are responsible for providing the corresponding spare parts fitting.
 
II. Training
 
1. The supplier will supply technical training to the user, including equipment structure and maintenance, equipment control and operation. The training will be carried out on the commission site. The supplier will send qualified technicians for training.
2.Under the training, technicians of the user will master skills about operation and maintenance, be able to adjust techniques expertly, and be able to deal with general fault.
 
III. Quality Guarantee
 

1. Our company guarantee provides the cargo is brand-new, has not been used, manufactured by the newest design and the appropriate material, and conforms to the contract provision quality, the specification and the performance in each aspect.

2. Our company guaranteed the production line passes through its correct instruct ins

You May Like

Find Similar Products By Category

You May Like

View More
Chat Now Contact Now